bored piles造句怎么写
- 造句
- 关注:2.33W次
According to the depth of the circumstances of the excavation, the bored piles and soil anchor-bar are adopted.
This paper introduces the design treatment of karst caves at the location of bored piles at karst district.
Construction of bored piles in steel cofferdam as pylon foundations in main channel for the SecondChangjiang River Bridge in Wuhan is emphatically recounted.
- 文章版权属于文章作者所有,转载请注明 https://zhongwengu.com/zh/sentence/mmwnd1.html