当前位置:中文谷 >

造句

> cost estimation造句怎么写

cost estimation造句怎么写

It provides a valuable input for cost estimation, scheduling, and evaluating the progress of the project.

Feasibility study on construction project,investment budget calculation,engineering project cost estimation,final account settlement and calculating the cost bottom data for tendering project and project's economic evaluation,engineering cost surveillance and control.

For each predicate in the query, query Tuner adds statistics annotations for the referenced columns in the predicate and also the cost estimation for the predicate.

This paper presents a method to select PDC bits. This method USES a correlation between shear strength and drilling cost estimation per unit length.

cost estimation造句

Application of BP neural network in engineering cost estimation;

Finally, the original cost estimation of open caisson pump house is made with the geometric optimization.

There are three main methods of cost estimation: expert method, analog method and parameters model method.

Regarding the rock mass classification, for design and project cost estimation, it should be different from those in bore & blast.

On the significance of the implementation of the cost estimation norms for bills of quantity in construction projects and its precautions

Accurate cost estimation and effective cost control can accumulate financial power and strengthen competition ability of software enterprise.

Fast cost estimation with quantity bill of construction based on fuzzy similarity precedence ratio;

Manage the project budget based on the cost estimation budget.

This includes information such as response time, an SQL statement's count of that transaction, cost estimation, sorting statistics, locking related details, and so on.

Reliable software cost estimation is not only about using the right tools and techniques.

标签: cost estimation 造句
  • 文章版权属于文章作者所有,转载请注明 https://zhongwengu.com/sentence/m22p78.html